Full renovations across Albania — Vlorë, Sarandë, Tirana · Free written quote+355 69 483 4301

BATHROOM RENOVATION · 2–3 WEEKS · VLORË, RIVIERA & TIRANA

Full bathroom renovation — from plumbing to tiles, in 2–3 weeks.

Demolition, new plumbing and electrics, waterproofing, tiling, sanitary ware and lighting: a new bathroom, dry and free of moisture problems — with a written price and a timeline we respect.

2–3 weeks, written timelineFull tested waterproofingFixed price before workFinal clean included
Bathroom Renovation

WHAT’S INCLUDED

What a full bathroom renovation includes.

The bathroom is the most technical room in the home — here is what we do, step by step, in every full renovation:

Demolition & systems

  • Removal of old tiles, sanitary ware and furniture
  • New plumbing: pipes, manifolds and valves
  • New electrics with protection for wet environments
  • Preparation of points for shower, basin, WC and washing machine

Waterproofing & tiling

  • Full waterproofing of the floor and shower area
  • Non-slip floor tiles and wall tiling
  • Clean edges, profiles and professional silicone seals
  • Drain and seal testing before moving on

Sanitary ware & fittings

  • Quality WC, basin and taps
  • Walk-in shower enclosure or bathtub, depending on space
  • Mirror, lighting and bathroom accessories
  • Effective ventilation against moisture

Finish & handover

  • Clean silicone seals and finishing details
  • Professional final clean of the bathroom
  • Full check of systems and fittings
  • Handover with a warranty on the works carried out

CLEAR PRICING

How much does a bathroom renovation cost?

Bathrooms are priced as a total, not per m² — here is the real market range for a full bathroom:

ServicePrice
Full bathroom renovation (demolition, systems, waterproofing, tiling, sanitary ware)€2,000–5,000
Partial repairs (taps, silicone, fittings)quoted after a free inspection

Indicative market prices — free written quote before any work. €2,000–5,000 is the indicative market range for a full bathroom: your fixed price depends on dimensions, the condition of the systems and the materials you choose.

HOW IT WORKS

The 4-step process.

1. Free visit & measurement

We see the bathroom on site (or with photos/video if you are abroad), check the systems and measure every detail.

2. Written quote with fixed price

Works, materials, the 2–3 week timeline and the fixed price — everything in writing before we start.

3. Works, phase by phase

Demolition, systems, waterproofing, tiling and fittings — with photos on WhatsApp after every phase.

4. Testing & handover

We test the water, drains and electrics; we clean and hand you the new bathroom.

WHO IT’S FOR

Who this service is for.

Bathroom renovation is one of our most requested services — especially from:

  • Families living in the apartment who want a new bathroom without moving out
  • The diaspora preparing the family home for summer or for the return
  • Owners preparing an apartment for rental — the bathroom is what decides
  • Anyone struggling with moisture, mould or old plumbing

WORKS WELL WITH

Services that pair with the bathroom:

Most clients combine the bathroom with the kitchen — one team, one intervention, one quote.

Kitchen Renovation

A functional, beautiful kitchen: new plumbing and electrics, tiling, made-to-measure furniture and planned lighting.

from €1,500

See Kitchen Renovation →

Apartment Renovation

Full apartment renovation — plumbing, electrics, plastering and finishes — with a fixed price per m² and photo reports after every phase.

from €250 / m²

See Apartment Renovation →

Turnkey Renovation

From design to furnishing: we manage everything and hand you the keys. Ideal for the diaspora and owners living abroad.

from €350 / m²

See Turnkey Renovation →

FREQUENT QUESTIONS

Questions about bathroom renovation.

How much does a full bathroom renovation cost?
The indicative market range for a full bathroom (demolition, new systems, waterproofing, tiling and sanitary ware) is €2,000–5,000, depending on dimensions and materials. Indicative market prices — free written quote before any work.
How long does it take?
A full bathroom normally takes 2–3 weeks: demolition and systems in the first week, tiling and fittings after. We write the timeline into the quote and stick to it.
Why is waterproofing so important?
On the coast, moisture and salt accelerate damage. Proper waterproofing protects the floor and shower area for decades — that is why we always include it and test it before tiling.
Can I use the bathroom during the works?
Not during the main phases (demolition, systems, tiling). If you only have one bathroom, we plan the work to minimise the time without it.
Do you buy the sanitary ware and tiles?
Yes — we choose them together (with photos if you are abroad), buy them with invoices and fit them. Alternatively you buy them and we carry out the works only.

Message us on WhatsApp — reply within minutes

Tell us about your property — apartment, villa or studio — and what you want to renovate: bathroom, kitchen or a full turnkey renovation. We reply with a clear price, in writing, before any work starts.

or call us: +355 69 483 4301 · Your data is only used to contact you back — no spam.

Free quote, no obligation

Call Now WhatsApp
Chiama ora WhatsApp