PERMITS & AUTHORISATIONS · A PRACTICAL GUIDE
Renovation permits in Albania: what you need and what you don’t.
Since 20 June 2024 most interior renovations are free of permits — no building permit, no prior declaration. But there are important exceptions, especially in tourist areas and historic centres. Here is our practical guide, based on everyday work.
Interior works: permit-free since 20 June 2024
Since 20 June 2024, interior works that do not touch the load-bearing structure require no building permit and no prior declaration. This covers the large majority of typical apartment and villa renovations.
In practice: if your renovation stays within the walls of your property and does not touch columns, beams or load-bearing walls, the works can start straight away — no paperwork, no administrative fees.
- Non-load-bearing partition walls — removing or adding
- Floors, tiles and parquet
- Plumbing and sanitary installations
- Interior electrical systems
- Plastering, painting and finishes
When a permit is needed: the application is online, on e-Albania
A permit is required when the works affect the structure, the façade or the shape of the building. The application is made online on the e-Albania portal, with technical documentation signed by a licensed architect or engineer.
If your project falls into this category, we tell you openly at quote stage: the application takes extra time, which must be factored into the works calendar.
- Interventions on load-bearing walls, columns or beams
- Façade works (colours, render, balconies)
- Extensions, enclosed balconies or new structures
- Change of the property’s designated use
UNESCO zones: Gjirokastër and Berat
In the historic centres of Gjirokastër and Berat — UNESCO-protected areas — the rules are stricter: façades, roofs, windows and anything visible from outside must respect the traditional character of the area and require additional approvals.
This does not mean you cannot renovate — it means planning must start earlier, with suitable materials. Fully interior works generally remain permit-free.
Tourist season 2026: noisy sites suspended until 15 September
Under the 2026 decision, noisy construction sites in tourist areas are suspended during the summer season, until 15 September. Interior finishing works — plastering, painting, installations, furnishing — are exempt and continue as normal.
For you this means one simple thing: if you own an apartment in Sarandë, Ksamil or on the Vlorë Lungomare, demolition and heavy works are planned outside the summer, while interior finishes can run all year round.
Our practical advice, without filler
For a standard interior renovation, you can start immediately — do not delay your project over paperwork you do not need. If the property is in a protected zone or the works touch the structure or façade, check first: we will tell you honestly which case applies to you, and when official paperwork is needed we work with licensed architects and engineers.
Permit questions
Do I need a permit to renovate my bathroom or kitchen?
How do I apply when a permit is needed?
I own a property in Gjirokastër or Berat — what changes?
I have an apartment in Sarandë. When can works happen?
Who checks that the rules are followed?
Message us on WhatsApp — reply within minutes
Tell us about your property — apartment, villa or studio — and what you want to renovate: bathroom, kitchen or a full turnkey renovation. We reply with a clear price, in writing, before any work starts.
Message us on WhatsAppor call us: +355 69 483 4301 · Your data is only used to contact you back — no spam.
Free quote, no obligation